Introducing our high-capacity 30000mAh Li-polymer Power Bank, a robust portable charging solution for all your devices. With versatile charging options, including Lightning and Type-C inputs, this power bank ensures swift replenishment. The advanced Li-polymer battery guarantees reliability and durability. Featuring a Lightning Cable output delivering up to 18W, and a Type-C Cable Output providing an impressive 22.5W Max, this power bank accommodates fast charging needs. Additionally, the dual USB outputs allow for simultaneous charging of multiple devices at 5V/2A each. With a sleek design and powerful performance, this power bank is your ideal companion for on-the-go charging, ensuring you stay connected without compromise.
Key Features:-
• High Capacity: 30000mAh for extended device charging.
• Versatile Inputs: Lightning and Type-C inputs for flexible recharging.
• Adaptive Type-C Output: Up to 22.5W Max for fast charging.
• Multiple Charging Ports: Dual USB outputs, Lightning, and Type-C Cable outputs for simultaneous charging.
• Quick Charging: Supports fast charging for efficient device replenishment.
• Reliable and Durable: Built with a durable Li-polymer battery.
• Sleek Design: Compact and portable for on-the-go charging.
• Wide Compatibility: Suitable for smartphones, tablets, and other USB devices.
• LED Indicators: User-friendly display for monitoring power bank status.
Specifications:
Model Name:- EVM Enlarge Pro White 30000MAH Power Bank EK1240
Model Number:- EK1240
Color: White
Capacity: 30000mAh
Battery Type: Li-polymer
Lightning Input: 5V/2A
Type-C Input : 5V/3A, 9V/2A, 12V/1.5A
Type-C Output : 5V/3A 9V/2.22A 12V/1.67A (20W Max)
USB Output: 5V/2A each
Lightning Cable output : 5V/3A, 9V/2A, 12V/1.5A (18W Max)
Type-C Cable Output : 5V/3A 9V/2.2A 12V/1.67A 5V/4.5A (22.5W Max)
Product Dimensions: 15 x 7 x 4.5 cm
Packaging Dimensions: 17 x 11 x 5 cm
Packaging Weight: 695 Grams





















