Experience the perfect blend of enduring aesthetics and durability with the EVM EnZest True Wireless Earbuds. These earbuds boast a sleek design that pairs seamlessly with their robust construction, ensuring long-lasting performance. Each earbud is equipped with a 40mAh battery, while the accompanying charging case features a 500mAh battery capacity. Charging is a breeze, taking only about 2 hours for a full charge. Enjoy wireless freedom with a Bluetooth range of 10 meters, complemented by dedicated microphones for clear and crisp communication. The audio experience is elevated through 12mm titanium speaker drivers, delivering rich and immersive sound. With a remarkable playing time of up to 8 hours, the EVM Enzest True Wireless Earbuds redefine your auditory experience.
Key Features:
• Aesthetics & Durability: Stylish design paired with robust construction for enduring aesthetics.
• Battery Capacity: Each earbud features a 40mAh battery, and the charging case boasts a 500mAh capacity.
• Quick Charging: Approximately 2 hours for a full charge, ensuring minimal downtime.
• Wireless Range: Bluetooth connectivity with a range of 10 meters, providing freedom of movement.
• Clear Communication: Dedicated microphones for clear and effective communication.
• Immersive Audio: 12mm titanium speaker drivers for a rich and immersive audio experience.
• Extended Playing Time: Enjoy up to 8 hours of uninterrupted listening pleasure on a single charge.
Specifications:
Model Name: EVM Black EnZest True Wireless Earbuds EK1244
Model No: EK1244
Color: Black
Bluetooth Version : 5.3
Frequency : 20Hz – 20KHz
Earbud Battery : 40 mAh each
Charging Case Battery : 500 mAh
Working time earbud : About 8 hours per charge
Charging time : About 2 hours
Standby time : About 100 hours
Bluetooth Range : 10 meters
Product Dimension: 7 x 6 x 4 cm
Packaging Dimension: 15 x 11 x 4 cm
Packaging Weight: 100 Grams























